Industry applications

Aerospace project inquiries

Discuss custom metal components, fixtures and tooling with the engineering team. Project requirements determine the processes, documentation and qualification needed.

Cutting tool and workholding inside a Yihongteng CNC machine

When to consider this process or material

Compare the part’s required geometry and use with these typical options.

Components

Share the design intent and the key features that need dimensional review.

Explore this option →

Fixtures and tooling

Provide the fixture scope, interface drawing and validation requirements.

Explore this option →

Qualification review

State the supplier approvals and records required before procurement.

What affects price, lead time and acceptance

Use the same assumptions when you compare suppliers.

Quote and lead time drivers

Customer qualification criteria, material sourcing and traceability should be reviewed at the first inquiry. Share any program-specific approval steps relevant to your project.

What to approve and inspect

Identify who approves the manufacturing route, inspection records and the release of samples. Confirm documentation and supplier requirements before tooling or production.

Clarify the project scope at the RFQ stage

Add these details to your drawing or inquiry.

  • Identify the intended use and any process or supplier approvals required.
  • Give critical dimensions, traceability and inspection records up front.
  • Describe the customer approvals and acceptance gates before manufacturing.

Review your project with us

Send the current drawing revision, expected quantities and the specifications for supplier requirements and approval records.